New Beginnings Construction & Design

Planning · 6 min read

Why Winter Is the Best Time to Plan Your Spring Deck (and Finish Your Basement)

As an Amazon Associate I earn from qualifying purchases. It costs you nothing extra, and we only recommend what we'd tell our own customers to use.

Most people start thinking about a deck the first warm Saturday in April. By then, most good builders around here are already booked into summer. If you want to be grilling on a new deck by Memorial Day, the time to plan it is right now, while there's snow on the ground.

1. Spring schedules fill up in winter

Every year it's the same: the calls come in all at once when the weather breaks. The homeowners who planned over the winter are the ones whose decks get built first. Everyone else waits.

A deck isn't just a few weekends of building. There's measuring the yard, picking the layout and materials, drawing the plans, and pulling the permit before anyone digs a footing. Doing all of that in winter means your project is ready to start the moment the ground thaws.

2. Book now and lock in this year's material pricing

Decking, railing and lumber prices tend to move up over time, and we expect another increase in 2027. That's why we're doing something simple this winter:

Book your deck now, and we'll get your decking material at this year's cost, before prices go up in 2027.

On a composite deck, the boards and railing are a big part of the budget, so locking in the price now can make a real difference. Ask us about it when you reach out.

3. You have time to make the decisions that matter

When you're not rushing, you make better choices. Winter is the time to think through the stuff that's hard to change later:

Want some ideas while you plan? See the lighting, furniture and finishing touches we recommend on our deck & DIY picks page.

Planning tip: See options on Amazon

A laser measure makes it easy to measure your yard, door openings and window heights, so you have real numbers when we sit down to design.

4. Winter is the best time to finish your basement

Basements don't care about the weather, and winter is when we can give them our full attention. A basement started in the winter is usually done well before graduation parties, summer guests or the next school year.

Here's how a typical basement project goes for us:

So a basement you start planning now can realistically be finished by spring or early summer. For more detail, read how long a basement remodel takes in Michigan, or see our basement finishing page.

5. Kitchens too

The same goes for a kitchen remodel. Planning cabinets, counters and layout takes time, and some materials have lead times of several weeks. Starting the planning in winter means fewer surprises and a kitchen that's finished before you want to be outside all summer. See our kitchen remodeling page for what's involved.

How to get started

  1. Tell us about your project: deck, basement, kitchen or all three.
  2. We'll set up a time to look at the space and talk through what you want.
  3. We put together your design and price, and get you on the schedule.

The earlier you reach out, the better your spot on the spring schedule.

Getting ready for spring?

See our deck & DIY picks

Want to be first on the spring schedule?

Book your deck now and we'll lock in your decking material at this year's cost, before prices go up in 2027. Basement and kitchen projects are on the winter schedule now too. Tell us about your project and we'll set up a time to talk.

Start your project